Lexan Label

Lexan Label Minimum Order and Production Process: FAQ

📅 2025-09-125 min readBora Ajans

Frequently asked questions about Lexan label minimum order quantity, lead time and the production cycle. The answers below cover the typical project flow at Bora Ajans.

📌 Minimum Order Quantity

MOQ is set per product specification. For UV digital prints we can start from a single prototype; for screen-printed runs the natural minimum is around 100 pieces because of plate setup. Send your design and we will define the optimal MOQ together.

📌 Lead Time

Standard lead time is 5–10 business days from artwork approval. Express production (2–3 business days) is available with surcharge. Complex assemblies including embossed keypads run 10–15 business days.

📌 Accepted File Formats

  • Preferred: AI (Adobe Illustrator), CDR (CorelDRAW), vector PDF, EPS
  • Accepted: high-resolution PNG / JPG (min 300 dpi)
  • Not ideal: screenshots, low-resolution Word images

📌 Sample and Prototype

For new projects we recommend a paid sample run of 1–10 pieces before production. Sample lead time is typically 4–6 business days. Once approved, production runs against the same artwork.

📌 Revision Cycle

One round of artwork revision is included free of charge after first quote. Additional revisions are quoted on time-and-materials.

📌 Export Lead Time

For Germany, Austria, Switzerland and France: 5–10 business days production + 5–10 days transit. Express via DHL/UPS available.

📞 Get a Quote

Get a Quote

Price and lead time depend on the project.